Loading Events

Daikin VRV Installation & Commissioning
5/17-5/19 (3 DAY CLASS)

Attendees must attend all 3 days to obtain factory certification.

 

Day 1 (5/17/22 8AM – 4PM): Course covers how to properly administer the installation practices for the Daikin VRV IV X and Emerion indoor and outdoor equipment and accessories using the proper tools and equipment.

Day 2 (5/18/22 8AM – 4PM): Course covers proper procedures to administer the installation and commissioning steps for the Daikin VRV IV equipment product line and the proper usage of the Daikin commissioning software.

Day 3 (5/19/22 8AM – 4PM): Course covers proper procedures to administer the installation and commissioning steps for the Daikin VRV IV equipment product line and the proper usage of the Daikin commissioning software.

* VRV IV Installation and VRV IV Commissioning classes are pre-requisites for VRV Service
and Troubleshooting Level 1

 

 

Sign Up Below:

Please select a valid form

Leave a Reply

Happy 2023 from the Swan Associates team.

Swan wishes everyone a very Happy New Year!

January 4, 2023

Swan wishes everyone a very Happy New Year! Happy 2023 from the Swan Associates team.

Nortek Air Solutions Coil News

December 27, 2022

WILL YOUR WATER COIL DRAIN? Water coils should have a vent at the high point and drain at the low point. Nortek coils are produced with either 1/8”, 1/2” or 3/4” vent and drain. These options make no difference if the coil is not built correctly. Lead Times As a reminder, in the current state of the world, all manufacturers face supply chain challenges obtaining materials for production. The following are the current challenges we face in the coil market:

Scroll to Top